Search

POSHE SOLUTIONS

Showing posts with label fire and safety courses. Show all posts
Showing posts with label fire and safety courses. Show all posts

Monday, 17 August 2015

Examples / Advantages & Disadvantages of Visual & Graphical Communication

Examples of Visual & Graphical Communication:

  • Slides
  • Computer Projection
  • Diagrams
  • Charts
  • Tables
  • Models
  • Maps
  • Photographs
  • Body language
  • Films
  • Video Tapes


Advantages & Disadvantages of Visual & Graphical Communication:


POSHE SOLUTIONS PVT LTD 

NEBOSH IGC + NASP Advanced Diploma in OSH”

Rush to Grab your Special Offer ! Registration Open Now !



For more Details Contact:
+91 90258 02211 |  +91 80566 75918 | +91 44 4332 4155
inquriy@poshesolutions.com

Thursday, 30 July 2015

Mobile Tower Scaffolds - HAZARD / PRECAUTONS

Mobile scaffolds may be constructed using tube and coupler scaffold, fabricated frame scaffold or modular type scaffold. As with any supported scaffold, however, it can be configured in many different ways. This tip sheet highlights some of the key items to keep in mind when inspecting, erecting, maintaining, and using mobile scaffold.

Hazard
Precautions
Collapse.
Erection by Competent persons. Pre – use inspections to ensure properly erected
Overturning (general)
Base plates used in preference to wheels where there is no need to move.
Positioned on firm level ground.
Checked to ensure vertical before use.
If wheeled then wheels locked before use.
Height not to exceed minimum base dimension by x3 for external use x3.5 for internal use.
Overturning (additional risk factors).
Lower height to base ratios.
Use of Outriggers to broaden base.
Sheeting.
Trying in to adjacent structures.
Overloading .
Water jetting /grit blasting .
Access via a fitted ladder inclined within the tower providing a route to the work platform through a lockable ‘trap door’
Supporting hoists/waste chutes
Procedures to ensure storage of materials are kept to a minimum.
Climbing the tower/use of external ladders.

Moving a wheeled tower
Procedures to ensure towers are not moved when there are people or materials on the upper platforms or in very windy conditions.
People falling.
Fully boarded platform with suitable edge protection comprising guardrail , Toe boards and intermediate rail or brick – guard
Falling Objects .
Barriers erected at ground level to prevent people from walking into the tower or work area.
Wearing of construction safety helmets for ground staff.
Overhead obstructions / power lines.
Site inspection before initial erection and before any moving of an erected tower on site.

POSHE SOLUTIONS PVT LTD
NEBOSH IGC‬ + NASP Advanced Diploma in OSH‬"
Registration Closing on 2nd Aug'15 !
Rush to Grab your Special combo offer !

Exam Date : 2nd Sep'15
Batch Starts 17th Aug'15

10 Days Excellent Classroom Training !


For more information Contact
WhatsApp/Call @ +91 90258 02211
inquiry@poshesolutions.com
www.poshesolutions.com


Monday, 27 July 2015

Structure of Health & Safety Policy

Structure of Health & Safety Policy

Statement of Intent:

A Statement of Intent is a commitment to continual improvement in Health & Safety by demonstrating Leadership, Effective management & Provision of resources. 
It communicates the Importance of Health & Safety to all Stake holders. eg.., Employees, Investors,Customers..etc,..

Organization:

The organizations aspect of Health and Safety management is to do with the distribution of responsibilities throughout the organization, starting at the very top management and working down through all levels and divisions to the employee on the shop floor.




Arrangements:

These are the systems,procedures & other measures necessary to put the Policy into effects. They should explain clearly how Health & Safety will be achieved in the Organisation through the implementation, maintenance, monitoring, & review of preventative & protective measures.
As a minimum the arrangements section should have procedures to :
  • Plan
  • Organize
  • Control
  • Monitor
  • Review

Rush to Grab your Special Combo Offer !
NEBOSH_IGC‬ + NASP_Advanced_Diploma_in_OSH‬"
Registration Open Now for August'15 Batch !

Exam Date: 2nd Sep'15

Batch Starts 17th Aug'15
10 Days Excellent Classroom Training !


For more information Contact
WhatsApp/Call @ +91 90258 02211
inquiry@poshesolutions.com
www.poshesolutions.com